One specific thing I want to note is that this no longer connects with the pipeline sheet. In order to have multiple lines of parts issues, I can no longer parse it with the pipeline sheet inside of
Concern for Delay
Fridge. Marken needs to reach out to vendor to get actuall ship date and tracking. This needs to be installed at the beginning of the build